Quick-drying alkyd primer Bato 5l RAL 5010

Primer enamel is intended for painting machines, devices and structures, for metal, for steel and cast iron surfaces, and for renovating old paint coatings.

Lower shipping cost 9.23 €
Stock Status: In Stock
Delivery Status: 1-3 days
Shiping Time
65.01 €
Including Tax: 12.16 €
pcs

Description

Quick-drying alkyd primer for metal, Bato blue

Quick-drying alkyd primer in blue (RAL 5010). It is a vivid and intense shade of blue, characterized by depth and clarity.

This is a product intended for self-protection of steel, cast iron and metal surfaces and for renovation of old paint coatings.

It is recommended for single-layer painting of machine elements, devices and structures, especially in corrosive urban and industrial conditions.

It can be used as a primer for phthalic, modified phthalic and chlorinated rubber enamels.

The most important properties of alkyd primer enamel:

  • Fast drying time.
  • Anti-corrosion – protects metals against corrosion.
  • High adhesion to the substrate.
  • High mechanical resistance.
  • Ensures good adhesion of subsequent paint layers.
  • Contains active anti-corrosion pigments (zinc, calcium, magnesium phosphates).

Application of alkyd primer enamel:

  • Intended for independent use, does not require priming.
  • Protects metal, steel and cast iron surfaces.
  • Used for renovation of old paint coatings and elements made of steel, metal and cast iron.
  • Recommended for single-layer painting of steel, metal and cast iron machines, devices and structures.
  • For use in corrosive conditions (urban and industrial).

Preparing the substrate for alkyd primer enamel:

  • The surface should be cleaned of dust and other impurities and degreased.
  • In the case of renovation painting, the old paint layer must be removed.

Application of alkyd primer enamel:

  • Ambient temperature: min. 10ºC, max. 35ºC.
  • Substrate temperature: min. 5ºC, max. 35ºC, and at least 3ºC above the dew point temperature.
  • Air humidity: max. 85%.
  • Ensuring good ventilation is essential.
  • Painting should be avoided in very hot weather to prevent solvents from being released too quickly, which may negatively affect the quality of the coating.

Technical Data

Theoretical performance
about 9m2/l
Capacity
5l
Recommended number of layers
1-2
Application methods
pneumatic, hydrodynamic spray, brush and roller
Paint type
modified alkyd
Paint drying time
complete drying of the coating in approx. 24 hours
Coating post-curing time
approximately 48 hours
Applying another layer
wet-on-wet method, approximately 2 hours or after 24 hours
Contains xylenes.
Customer Reviews

Be the first to post a review for this product

Rate This Product

You must be signed in to rate this product

Similar Products